Ensure project continuity with relocatable workshops, storage, and offices that can be deployed instantly at any construction site.
Construction projects are by nature temporary and evolving. Fixed buildings are often too slow to build and impossible to move, leading to wasted capital and logistical bottlenecks.
Champion's modular fabric structures provide immediate, high-quality workspace that follows your project. Whether it's a batch plant cover or a remote site office, we deliver speed without compromise.
Accelerate your project timeline with modular designs that assemble in weeks, not months.
Hot-dip galvanized steel frames to ISO 1461 provide decades of service in harsh environments.

Versatile structures for every stage of operation.
Climate-controlled, rapidly installed professional workspaces for project management.
Keep cement, timber, and sensitive components dry and secure from theft.
On-site maintenance bays for excavators, cranes, and specialized plant.
Protect concrete batching operations from wind and rain for consistent quality.
Prefabrication and assembly areas that move with the construction phase.
Enclosed areas for on-site recycling and construction waste management.
Select the structure that best fits your site's operational requirements.
Versatile and relocatable. Perfect for long-term project workshops and large storage.
Ultra-fast deployment. Uses shipping containers as foundations for immediate site storage.
| Clear Span Range | 6 m – 50 m |
| Installation Speed | Up to 500 m² per day |
| Membrane Material | PVC / PVDF, 610 up to 1450 gsm |
| Steel Frame | Hot-dip galvanized Q235B (ISO 1461) |
| Relocatability | 100% modular and re-usable |
| Flame Retardancy | B1 / M2 / NFPA 701 |
Yes. Our base plate designs can accommodate minor level differences, and we offer various anchoring solutions like earth augers for unpaved ground.
Our structures are fully modular. A standard 20x30m workshop can be dismantled and packed into a shipping container in just a few days for relocation.
All our PVC membranes are treated with flame retardants meeting B1 (China), M2 (Europe), and NFPA 701 (USA) safety standards.
Construction projects shift phases quickly, making permanent infrastructure a wasted investment once the phase ends.
Unprotected sites face constant work stoppages due to rain, wind, or extreme temperatures, bloating project timelines.
Open-air storage leads to material theft and damage from moisture, increasing project costs.

Our heavy-duty TFB structures provide massive clear spans and resisting corrosion with hot-dip galvanized steel.
Perfect for rapid deployment, these shelters mount on shipping containers to provide immediate workshops.
Start work sooner with structures that can be fully operational in days.
Move your facilities as the project site shifts or project phases advance.
Eliminate rain delays and protect workers from extreme heat or cold.
Perfect for short-term projects where permanent buildings aren't feasible.
View our site solutions, check out modular buildings, or read about site safety engineering.
Consult our engineers for a custom solution today.
Request a Free Quote